Ask for the applicable completion or compliance documents, final drawings, installer commissioning information and any warranties your agreement calls for. Check who issues each record and the exact address and scope it covers. A certificate issued for one installation does not describe every trade involved in a larger project.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
List the documents before the final site visit
Use your application, quote and latest drawings to identify who owes each item. Leave a column for the actual copy or reference rather than checking off a verbal promise.
- Write down the building control contact, any application reference and the exact work they cover.
- Identify elements handled by registered installers, plus the names of the firms that should issue their own test or commissioning records.
- Prepare a list of products with model numbers, manuals, warranties and maintenance access information the house will need.
Step by step
Match the building control record to its approval route
The appropriate completion document depends on the route used for building control and the work it covers. Check with the building control provider who is responsible for arranging the final visit, what records they still need and when a document can be issued. Review their file with the person named in your contract as responsible for this part. Ask whether every relevant notification, test or declaration has been supplied. Get copies from the issuing authority or provider or by the agreed route, and check references and drawings. Ask what is missing if the provider cannot yet close its file. Keep the correspondence so you can see the outstanding inspection, document or remedial step rather than guessing from a completion date.
Identify documents that cover a single installation
A suitably registered installer can self-certify certain work under an authorised competent person scheme. Ask which scheme was used and what the resulting compliance record covers. An inspection or electrical test document may serve a different role from the resulting notification or building regulations compliance certificate. Some projects include more than one type of evidence. Keep each under its scope and responsible firm. Check the building’s address, date and the contractor’s details against the work you ordered. For appliances or controls, ask what the user can operate, how to obtain suitable maintenance and where service access has been left. Note any conditions the documents place on the products or system.
Use a worked example to reconcile an extension handover
Imagine an extension in England that includes a new room, electrical work and replacement windows elsewhere in the home. You are given a warranty leaflet for the glazing and a builder’s invoice marked complete. Compare each against the checklist. The new room’s building control route may require its own completion evidence. The windows’ warranty may be separate from a compliance record if the window work followed a competent person route. Electrical testing and other relevant records should be listed against the work they cover. Ask the project team which party will supply each missing item and by what date. Be careful about assuming a document for windows covers structure, ventilation or anything outside its stated scope.
Take control of the house file
Keep the final plan set, dated photos of agreed concealed work, maintenance contact details and any notices from separate planning or property approvals. Ask the contractor to demonstrate user-facing controls and isolate any concerns requiring professional correction. Record snag items separately from technical compliance decisions, with dates and the way resolution will be verified. Make a digital backup in a folder you can find when selling or extending the house. Put names, invoice references and a brief description on each item. A record of the exact product installed can prevent unnecessary investigation later when a fitting leaks, a sensor needs replacing or a new owner wants to continue a compatible maintenance routine.
Expert tips
- Ask for the product manual and proof of purchase together. A guarantee condition can depend on identifying a model, fitting date or maintenance requirement.
- Use a shared checklist during the project. Collecting a photo, reference number or test sheet at the relevant stage is often easier than reconstructing it after work is complete.
Common questions
Does building control check all snagging items?+
Building control has a defined remit. Keep the contract’s finish and snagging requirements in a separate list and agree how the contractor will resolve those items.
What if the completion record is missing years after the work?+
Ask the building control provider or installer scheme what it has on record and get local professional advice about any next step. Explanation and legal options depend on when and how the work was done.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- GOV.UKWhen building regulations approval is neededOfficial overview of regulated work and the difference between planning and building regulations.↗
- GOV.UKUse a competent person schemeHow eligible registered installers certify their own specified work.↗
- Oxford City CouncilBuilding control frequently asked questionsExample of an English local authority’s building control visit and completion process.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.