Give each builder the same written scope, drawing revision and finish schedule. Compare what the price includes, what is excluded, whether VAT applies and how allowances are adjusted. A useful quote also identifies work by others, payment stages and the evidence you expect before handover. Ask about unclear lines while all bidders can revise them.
Use the UK room renovation planner to estimate sheets, insulation and coatings together and save a PDF materials list.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Issue one package so every builder answers the same brief
Mark each document with its date and revision. Use the package for the first site meeting and send any answers to everyone who is still pricing it.
- Draw the rooms and mark what stays, goes or moves. Label separately supplied items by buyer and installation responsibility.
- List access, hours, protection, waste, final connection, testing and making good. Point out any occupied spaces and shared routes.
- Ask for the total including any VAT charged, payment milestones and separate prices for work that may change after assessment.
Step by step
Decide which details affect the work and the price
For a kitchen scope, list the parts a bidder can measure on site and any exact items you have selected. Identify who disconnects existing appliances and who will reconnect and test them. Name the rooms that need repair or redecorating after new services pass through them. Include any splashback work, substrate checks and how the final edge will meet the worktop and units. Tell bidders which information is provisional so any allowances are visible. You can ask for alternates, including an option using a different finish, provided the price sheet states exactly what has changed. Take notes during the survey and clarify the scope for every bidder who needs it.
Classify each price before comparing totals
A quote and an estimate carry different expectations, so ask which figure the builder is offering. Confirm the price for the agreed scope and which sums may change. Clarify provisional amounts for materials, removal of unexpected damaged material or other work that cannot be measured before an assessment. Record who authorises a change and what paperwork the builder will provide. Also verify the name of the contracting business and its relevant insurance or credentials for the proposed work. A quote can omit part of the job while still claiming to describe the room. Ask for missing lines instead of substituting your own assumptions about how a builder usually works.
Compare a kitchen splashback example at equal scope
Suppose a written kitchen quote is £5,200 and excludes splashback labour and waste removal. You obtain a separate £450 labour quote and a £180 waste cost on the same basis, giving £5,830 for the combined example scope. Another gives £5,680 including both but lists a £250 difference if you choose a larger-format tile. On those illustrative figures it would reach £5,930 with that option. Ask both builders to confirm VAT treatment, tile supply, preparation, trims and who measures or orders the boxes. Compare either the same tile choice or two clearly labelled options. This arithmetic illustrates a scope reconciliation. It does not estimate market prices or track a contingency for conditions that are still unknown.
Put the accepted work and handover in writing
When ready, make sure the contract lists the exact quote and drawing revision, the milestones that trigger payments and the way to agree changes. Ask for a completion list that includes cleaning, documents, keys or controls and any applicable compliance evidence. If another trade is doing related work, identify which contractor hands an interface over and who repairs damage or gaps between stages. Keep everyone’s contact information and share how issues will be raised and resolved. Use the document set as a working record during the project. Record changes by date, price, time and what rooms they affect, and update the payable total so the final account can be understood.
Expert tips
- Keep separate columns for included, excluded and awaiting clarification. Put costs from different suppliers on the same VAT basis and record the agreed wording rather than relying on a verbal recollection.
- Ask for the same site protection and removal standard in each price. Access for equipment and the route through occupied rooms can affect the quote without changing the final look.
Common questions
Should I always pick the cheapest written quote?+
Compare work descriptions, exclusions, allowances and credentials before choosing. A smaller total can reflect a narrower scope, a different product or a cost that another supplier is expected to pick up.
What if I am still choosing finishes?+
Give bidders a common allowance or clearly defined options and ask how a change affects labour and materials. Decide who will approve the final item and how the difference will be recorded.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- Citizens AdviceBefore you get work done on your homeEngland consumer guidance on written quotes, contracts and paying for home improvements.↗
- legislation.gov.ukConsumer Rights Act 2015, servicesPrimary law on consumer contracts for services, including reasonable care and skill.↗
- Citizens AdviceProblem with building work, decorating or home improvementsEngland consumer guidance on documenting and resolving issues with a trader.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.