THE SHORT ANSWER

In England, planning permission deals with whether a development is acceptable in its location. Building regulations deal with how the building work meets applicable technical requirements. The same home project can need both checks. Establish the planning position and ask building control or the relevant registered installer route about your exact scope before starting.

Regional note

This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.

Preparation

Write one scope for each authority to read

Use a dimensioned description of the site and the intended changes. Your first discussion can be more useful when each person works from the same drawings and address.

  • Record the address, property type and any known conditions or designation affecting the property.
  • Mark existing and proposed spaces, walls, openings, external dimensions and differences in use.
  • List related alterations such as ventilation, drainage and electrical work that may be in a separate trade quote.
The method

Step by step

01

Ask what the planning decision covers

Planning concerns include the effect of a development on the character of an area, neighbouring properties and the suitability of a proposed use. Start with the local planning authority for the property. Use the same description when checking its application history, adopted constraints and any potentially applicable permitted development rights. A neighbour’s similar project is a useful example to look up. Their drawings, conditions, property type and site may explain an outcome you cannot see from the street. Ask what confirmation is available for your proposal. If the council requests a drawing or a particular application, record the exact version so your next contract uses the same proposal.

02

Ask how the technical work will be checked

Show the building control contact the intended work and ask which approval and inspection route applies. A layout and finished elevation may still need technical information about a structural opening, drainage, fire safety or ventilation. Some defined categories of work can be certified by a suitably registered installer under a competent person scheme. Ask what the scheme covers for that part of the job and who handles the remainder. Keep the contact, application reference, inspections or notifications needed, and the completion evidence expected. Give the builder a copy of the schedule. Identify any stage the inspector needs to see before it becomes concealed by finishes.

03

Put both decisions on a single revision list

Imagine a one-storey rear extension with a wider opening between the existing dining room and the new room. The planning check concerns the extension and its effect at the site. Even where the extension falls within applicable permitted development rules, the opening and new construction may require technical design and inspections. If a designer later moves the opening and increases the exterior width, ask both teams which drawings or decisions need updating. Use the revised reference and date on any new price or order. A builder quoting from an early layout can be pricing different work from the approved or inspected scope. Record decisions separately so you can see what each actually covers.

04

Identify permissions that sit outside either track

A leased property may require consent under the lease. Listed building work and some projects near shared structures can also bring separate requirements. Include those in the brief early so the order of approvals reflects the actual property. For work that changes the weather envelope, shared services or structural support, ask who is responsible for checking every interface between trades. Record the documents that eventually belong in the house file, including any notices and construction certificates. If one question remains open, arrange the contract and ordering around a clear decision point. Early purchases can lock in a dimension or finish before the decision has established what can proceed.

Before you start

Expert tips

  • Ask a building control contact about current requirements for a particular project date. Regulations and guidance can change, with different editions applying to different projects.
  • The examples here concern England. Look up the planning and technical approval regimes for Scotland, Wales or Northern Ireland separately if that is where the property is.
  • Create a small decision register with separate rows for the planning reference, the building control route and any other consent. Name the person who holds each document and the drawing revision associated with it.
People also ask

Common questions

Does a planning decision mean that building control has signed off the structure?+

Planning and building control have separate purposes. Keep the planning decision and the applicable building control documents against the same drawing revision and verify what each body actually reviewed.

Can my builder arrange both checks?+

A builder or designer may handle submissions if that is agreed. Put the responsibility, covered scope and handover records into the contract. The homeowner should know which route is being used and have copies of the decisions.

Primary references

Sources & further reading

We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.

  1. GOV.UKWhen building regulations approval is neededOfficial overview of regulated work and the difference between planning and building regulations.
  2. Planning PortalPermitted development rightsEngland planning guidance on project eligibility and removed rights.
  3. GOV.UKUse a competent person schemeHow eligible registered installers certify their own specified work.
!
Know your limit

Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.