On this page
Keep the final permissions, referenced plans and evidence showing which work was actually done. Where a lease required consent, retain the signed consent or licence and any required handover records. Keep them with the separately applicable public approvals and installation documents. If a record is missing, ask your conveyancer or leasehold adviser what evidence to obtain.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Collect records by job and date
For an England or Wales leasehold flat, put each recorded alteration against the address, lease and work scope. Include files held by the builder or managing agent when you can obtain them.
- Find the lease plans, relevant landlord or building management contact and the current version of any licence to alter.
- Collect specifications, approvals, invoices and photographs from the actual work. Record any known changes to the proposed drawings.
- List dates and names for any required inspections, notices, certificates and handovers described in the consent.
Step by step
Read the actual conditions and make an index
A landlord’s letter may consent to a scope defined elsewhere, often on specified plans. If you see only a general email, ask what drawings and conditions it refers to. Label the accepted design and distinguish it from later sketches. Build a row for each room or alteration, with links from consent to documents and evidence of completion, if required by the consent. Identify the firm who installed and handed over each part. A manager or buyer should be able to understand what changed without reading every project email from the beginning. Use the terms found in the actual consent and lease rather than assuming a standard list applies to every flat.
Match completion evidence to the works and the issuing body
Compare photos and final drawings with the documented consent. Where the contractor made an agreed change, include the relevant instruction and any revised landlord response. Keep building control records, installer certificates and guarantees in separate rows. Each can apply to only part of the job. Review any obligation to notify, inspect or report to the landlord after work. Ask for a copy of any accepted inspection or acknowledgement through the building’s usual process. Keep these alongside invoices and documents needed to operate the installation. A well labelled evidence file identifies both what was completed and any outstanding question that still needs someone with authority to answer.
Use a worked example to identify a gap before sale
Imagine a flat where the kitchen layout and floor finish were changed several years ago. The owner finds a dated landlord consent for replacing units, an installer’s invoice for new flooring and a public compliance document for a distinct installation. The consent does not clearly mention flooring. Separate these into three records and ask the conveyancer how to investigate the gap. Do not treat the flooring invoice as authorisation or the separate compliance record as coverage for all alterations. Find any communications or building management guidance that applied at the time and pass them on as evidence. Keep a list of documents checked and describe the absence in neutral terms before concluding which next step is needed.
Prepare one summary for the buyer’s questions
When selling, ask your conveyancer what they need for the transaction, including information that may come from the landlord or managing agent. Give them actual dates, the scope and references, and distinguish between decisions and documents you have asked for but have not seen. Let the adviser guide any further enquiries or steps about missing evidence. Save a shareable file without unrelated personal information so the correct papers can accompany the sale. Keep full originals in a secure backup. Future work may depend on the route of a shared service or the floor build-up that was agreed, so include clear handover notes about access and retained features as well as the records required for the sale.
Expert tips
- Ask the building contact exactly what its handover process records. Store the reference and the date, even when you already have a signed consent.
- Write document names that include the address or flat identifier and covered alteration. A label like 'Final' tells a new reader little about what to open.
Common questions
Can I assume an alteration was approved because a survey is in the records?+
A survey provides observations about condition or scope. Check whether the relevant permission was issued and which works and plans it covers. Ask for independent advice if the evidence is incomplete.
Does the management pack replace my own records?+
A pack can provide information held by the managing parties. Keep your own documents for the specific works, including the contract, condition responses and installer details that they may not hold.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- Leasehold Advisory ServiceAlterations and home improvementsIndependent, government-funded leasehold guidance for England and Wales.↗
- Leasehold Advisory ServiceBuying or selling a leasehold flat: process and timingPractical conveyancing and property management record checks.↗
- GOV.UKHow to sell a homeEngland and Wales seller guidance on gathering supporting information and building documents.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.