Check that the commissioning record identifies the installed system, rooms, settings, measured airflows and any design figures it is intended to verify. Each reading needs its location, units and operating mode. Ask the installer or designer to explain differences and record the final outcome. Confirm which requirements apply to your project in England.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Get the installation and test documents side by side
Start with the proposal and the final commissioning material. Ask the responsible people which documents relate to the regulatory route and installation at your address.
- Find the final system and room schedule, including specified settings. Note any changes from the first quote.
- Collect the installer’s test or commissioning records, user instructions and any related approvals or certificates.
- Identify the equipment, the room outlets and the contact who can demonstrate the controls safely.
Step by step
Trace each reading to the actual room and setting
Check that the record can be matched to the system the contractor fitted. Identical labels on two pages can mean different locations or settings if the layout changed during the work. Ask what was measured and what the units represent. Airflow may be recorded in litres per second, for example, while a technical brochure can list a laboratory figure on a different basis. Find out whether the reading is at normal operation, boost or another configuration. Consult the installer about any unclear description rather than trying to change equipment or undertake unapproved tests. Confirm when the readings were taken and whether they apply to the final installed configuration.
Compare equivalent figures and ask about exceptions
Put the design figure, operating mode and measured result together in the same row for each room or point. Ask how the installer decided whether the measured result meets the specified performance and applicable requirements. The relevant document and version can depend on the work and date. Do not compare a result for one mode and a target for another as if they were equivalent. Ask who should respond if the equipment, duct route or setting has been changed since design. Include any readings that are missing or marked as retest. Keep the commissioning and any regulatory evidence against the specific installation and responsible parties.
Reconcile an illustrative difference without diagnosing the cause
Suppose a room schedule specifies 15 litres per second in boost as part of an agreed design, and the record shows 12 litres per second at the same identified point and mode. The difference is 3 litres per second. Those example figures describe a gap to clarify rather than a legal threshold for every fan. Ask the installer whether the result is comparable, whether the design has changed and who will assess the outcome. If the difference is investigated and results change, request a revised record or a written explanation that includes what was checked. Look at the system as a whole rather than asking for a change to one setting without understanding its relationship to other rooms.
Recognise a usable handover record
Ask the installer to demonstrate ordinary operation and show when a setting should be used, who can change it and which maintenance is expected. Keep the final schedule and any accepted corrections with the house file and store user instructions somewhere occupants can access. Where formal records are needed, ask the project team how they are supplied and who tracks any outstanding questions. If moisture, noise or comfort changes after the installation, note when it happens and seek advice from the appropriate contact. Do not use an old measurement to assume current performance if the equipment, filters or system has changed. Record future service work with the equipment and room reference.
Expert tips
- Ask which record documents any necessary corrective work. A dated report should make it clear whether its readings preceded or followed an adjustment.
- Separate handover questions from changes you would like to make later. Ask the installer to explain which changes need a new check or assessment before work.
- Include normal access to cleanable or serviceable parts in a handover discussion. Cold draughts or noise should be raised with the right professional rather than dealt with by blocking ventilation.
- Write down any location with no test value and who will explain it. Missing information can be an exception worth recording even when the rest of the report is clear.
Common questions
Does an equipment rating confirm airflow in my room?+
Compare measured and designed results on the same basis. Ask the installer how the installed system was assessed and what any equipment rating refers to.
What if my report only says the fan turns on?+
Ask what evidence your project and agreed scope require and what was measured. Function, specification and measured performance are different questions.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- GOV.UKApproved Document F (2026)England ventilation guidance for work within its applicable scope and transition timetable.↗
- GOV.UKApproved Document F Volume 1, dwellingsDetailed England guidance and evidence examples for relevant ventilation measures.↗
- GOV.UKVentilation: Approved Document FEngland ventilation guidance and pointers to the applicable edition.↗
- GOV.UKExisting home ventilation guideEngland guidance for occupiers of existing dwellings following energy efficiency measures.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.