Ask which programme and edition the quote refers to and who is responsible for assessment, design, coordination and installation. Verify what evidence the household will receive and what the work will be registered against where a scheme applies. A reference to PAS 2035 in the quote is a prompt to confirm the process and its deliverables.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Collect the programme and proposed technical scope
Start with the original invitation, any funding terms and the contractor’s written offer. Ask where to find the current rules for that particular project.
- Record the provider, scheme name and what the quote says about assessment and installation.
- List any existing survey, moisture issue, heating system and possible ventilation change that affects what you hope to do.
- Ask who will handle each project role and who checks that work follows the accepted design.
Step by step
Read the quote as an outline of responsibilities
Some retrofit offers describe the actual insulation or heating product in detail while saying less about the survey and design. Ask which assessment will happen before the scope is fixed and what a homeowner can see of its findings. Ask who looks at the property as a whole and who decides whether the selected measures are compatible with one another. The contract should identify the responsibilities for any design, checks and variations. If the job is offered through a funding programme, use its current documents for the edition, paperwork and process that applies. A privately commissioned project can have a different arrangement. Compare what each offer actually includes before treating a shared acronym as comparable scope.
Request drawings and explanations of the difficult details
Find out how the proposed work meets the existing building around openings, access panels and connections to other measures. Ask what defects must be addressed first and how intended ventilation will work once the fabric changes. A good design question identifies both the element and the observation that matters, such as how a less accessible junction will be inspected before being concealed. Ask for a record of assumptions and when the design is revised if the survey reveals unexpected materials. Keep the coordination side explicit when the same project includes more than one firm. Confirm who decides whether proposed changes can go ahead and who records the outcome after installation.
Compare two illustrative offers for wall insulation
Imagine a quote that lists a square-metre allowance and a named installer. Another identifies an initial assessment, drawings for the planned junctions, a ventilation check and a named project coordinator. Ask both suppliers which items are included and which would carry additional costs, and what each requires before starting. If your project comes from a funded programme, ask that programme what evidence the provider must make available to you and whether the job is meant to be registered or lodged in the relevant system. Reprice the examples on the same scope, including repairs identified as prerequisites or explicitly left to others. Ask how each firm will address constraints after seeing the actual home.
Agree what will be handed to the occupants
Find out which commissioning information, design changes, warranties and care instructions will be held by the provider and what the household can keep. Ask who explains controls, ventilation and upkeep and records unresolved items. Confirm the process for requesting correction or support through the applicable scheme if something stops working. If there will be a registration record or a project reference, note which scope and address it applies to. Keep the original terms and dates so you can identify what was agreed precisely. Ask for a review point after the work, whether that is part of a scheme process or a separate contractual agreement. Record normal use and recurring concerns for the people carrying out any follow-up.
Expert tips
- Ask the organisation offering the project to identify the relevant edition and transition dates. Sources may refer to different programme periods and versions of the specification.
- Record the site survey separately from a product sales visit. Ask who carried out each, the scope of their inspection and whether their findings go into the design.
- Make the paperwork understandable for the people who will live with the controls. Ask whether a device can be serviced without removing new permanently fixed finishes.
Common questions
Does this guide decide whether PAS 2035 is mandatory for my project?+
Check the scheme, funding terms and agreed scope for the job. TrustMark’s guidance explains its processes, while the programme provider and applicable parties can verify the requirements for your case.
Can I compare two installers before any survey?+
Compare the survey and design steps they offer, proposed responsibilities and what their initial price assumes. Confirm the actual specification and price after the necessary checks.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- TrustMarkPAS 2035:2019 and PAS 2035:2023Retrofit standards context and links to scheme materials.↗
- TrustMarkPAS 2035:2023 Retrofit Design GuidanceGuidance on retrofit drawings, detailing, design responsibilities and handover.↗
- TrustMarkFramework Operating RequirementsOriginal requirements for registered businesses and their scheme providers.↗
- GOV.UKExisting home ventilation guideEngland guidance for occupiers of existing dwellings following energy efficiency measures.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.