THE SHORT ANSWER

Measure the actual framed opening in three places for width and at both sides for height. Record the smallest dimensions and compare them with the exact door unit's rough-opening chart. Also record wall thickness, current and future floor height, hinge side and the direction the door needs to swing.

Regional note

This guide is written for United States. Always check local codes, product specifications, licences, and site conditions. Browse the United States edition.

Preparation

Make a dimension sheet

Separate readings taken from visible trim from readings taken directly at framing.

  • Bring a tape measure, a level, a straightedge and a photograph of each side of the existing doorway.
  • Keep the floor finish specification handy if the flooring is changing.
  • Find the current installation sheet for the exact product and confirm whether you are ordering a complete unit or just a slab.
The method

Step by step

01

Identify which opening you can actually measure

A slab is the moving door panel. A prehung unit includes the panel and its own frame. The rough opening is the space inside the surrounding framing that receives the unit. Measurements between visible stop strips, decorative casing or the faces of an existing jamb describe different things. When the framing is concealed, write down the slab and jamb separately, photograph the doorway and mark the rough opening as unconfirmed. Have the installer verify it before ordering a custom or hard-to-return unit. For a rated or shared passage assembly, check its required specification before selecting a replacement.

02

Record the tightest point and the shape

When framing is accessible, take widths across the opening at the top, middle and bottom. Take heights on each side from the reference floor surface to the underside of the header. Record which floor surface you used and whether new layers are planned. A level or straightedge helps show out-of-plumb jamb sides, a bowed face or a sloping floor. Keep these readings alongside the minimum width and height. An opening can meet the nominal width at one point and still lack room to align the actual frame at another. Ask the installer to review noticeable distortion before committing to a unit.

03

Measure the jamb depth and finish changes

Record the wall thickness from one finished wall face to the other where the jamb will sit. Check more than one spot if the wall is tiled, plastered or being relined. Note how the casing will meet nearby cabinets, baseboards and switches. Compare the existing floor height with the proposed floor surface on each side. A new finish can affect clearances at the threshold or under the door as it swings. Ask how the supplier measures jamb width and how any new floor or paint work affects fitting. Do this while the floor specification can still be adjusted.

04

Compare with the model chart using real dimensions

Suppose the measured widths are 32 1/4 inches at the top, 32 inches at the middle and 31 7/8 inches at the bottom. Your minimum is 31 7/8 inches. If the exact unit you are considering requires at least 32 inches, the bottom is short by 1/8 inch. That hypothetical result gives the supplier a concrete question about another model or the installer's assessment of the opening. It does not establish which door is suitable from a label that says 30 inches. Keep the two height readings beside the width comparison and verify them against the same model document.

05

Confirm the swing with a drawing

Draw the closed door on a simple floor plan and show its swing arc. Label the hinge side, the room the door swings into, the sides from which the doorway is viewed, and anything in the swing path. Include furniture, towel rails and projecting hardware where they could matter. Then use the seller's handing diagram and ask for the order confirmation to match your sketch. Ask how the frame is supplied, where the latch and strike will sit, and whether jamb extensions or casing are separate. Keep the verified model number and reference drawings with your measurements.

Before you start

Expert tips

  • Take photographs with a scale reference and write all measurements as fractions of an inch on a single sheet.
  • Send the supplier the floor buildup and swing sketch with the measurements. It is easier to resolve a borderline fit before delivery.
People also ask

Common questions

How much larger should a rough opening be than the slab?+

Use the rough-opening requirement for the exact complete unit. Jamb construction, clearance and the product line determine the required dimensions. A generic gap rule cannot confirm the fit of your selected model.

Can I use the visible trim measurements to place the order?+

Use them to start a supplier conversation. Confirm framing dimensions and finished wall depth before buying a complete unit, especially where finishes conceal the framing or dimensions are close.

Where should I record clearance for new flooring?+

Mark the existing and proposed finish heights on both sides. Give those levels and the full swing path to the installer so the unit can be matched to the intended finished surfaces.

Primary references

Sources & further reading

We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.

  1. MasoniteHow to measure for interior doorsManufacturer explanation of measuring for interior door replacements.
  2. MasoniteDoor support and product resourcesProduct instructions and support for model-specific dimensions and installation.
!
Know your limit

Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.