Mark the finished edges with string, then divide the footprint into two rectangles that meet without overlapping. Check corner diagonals, walking space and where drainage and edging will go. Calculate the net area from the confirmed outline before adding a cutting allowance or ordering pavers.
Calculate pavers and full packs
This guide is written for South Africa. Always check local codes, product specifications, licences, and site conditions.
Step by step
Start with the finished boundary
Mark the house, doorway, steps, drain and any bed or inspection cover on a sketch. Decide where the surface is meant to stop and show any border pavers as a separate strip. Explain whether the requested dimensions are measured to the visible edge or to the outside of an edge restraint. A boundary can look right on paper and still leave too little space for a door to swing or a person to walk around furniture. Try the layout on the ground before committing amounts. Use removable markers where services may be present and avoid driving stakes or digging until the area is cleared.
Choose a reference edge and set parallel lines
Select a reliable reference that matches the intended layout. A wall can be a useful visual reference but may wander or sit at an angle to the property boundary. Mark the intended line with taut string and measure offset distances at several points rather than trusting one measurement at each end. Put the second reference line at the intended width and compare the two. If the layout needs to match an existing requirement, such as a path width or door landing, verify those dimensions in place. Keep strings visible and out of walking routes so they don't become a trip hazard.
Check corners and draw the two rectangles
Measure both diagonals in each intended rectangle. Matching diagonals are a useful square check once opposite sides are also equal. If they disagree, move a corner and remeasure the sides as well as the diagonals. For an L, use the internal corner as a dividing point and draw two shapes that share a boundary with no overlap. Mark the numbers directly on the sketch. For example, a 4 m by 3 m rectangle adds 12 square metres and a separate 2 m by 1.5 m arm adds 3, for a total of 15 square metres if neither includes the other.
Preview the pattern, cuts and edge details
Ask the supplier for the actual installed dimensions or coverage, and use a few representative units or a simple paper layout to check how the pattern meets the inner corner. A narrow sliver at a doorway can be a sign to adjust the start line or pattern before buying. Note any border with a different product and measure it separately so its area isn't counted twice. Confirm the finished slopes, drainage route and edge support with the installer. Do not use the quantity sketch to set excavation depth or alter ground levels near a building. Those decisions need the actual site conditions.
Convert the approved drawing into an order
Label the final sketch, date it and record any separate step, strip or border. Ask the installer for the cutting allowance for the chosen pattern, then use the supplier’s installed coverage and units per pack. For example, at 50 pavers per square metre, the 15 square metre example needs 750 units before cuts. Use real product coverage when ordering and round to full packs only after adding the agreed allowance. Recheck the drawing if you later move a drain, change the border or widen the doorway landing. Save the product number and layout with the quote so later revisions can be checked.
Expert tips
- Plan the route for water and maintain door and wall clearances before committing to the shape. Raise drainage concerns with the installer before costing the surface.
- Check any shared boundary or site constraints before marking for installation. The string outline is useful for discussion while the plan is still easy to change.
Common questions
Can I measure the whole outer rectangle and subtract the missing corner?+
Yes. Use the same reference edges, check the dimensions and subtract the cut-out once. Compare with the two-rectangle method if you want a cross-check.
Should the patio be square to the house?+
Only if that suits the design and drainage. A wall is not always straight or square to the proposed edge.
When do I add waste?+
After confirming the net area and product coverage. Apply the cutting allowance once before rounding up to full packs.
Sources & further reading