Finished floor-height checker

Add the installed floor layers and subtract the finish you’ll remove. Deduct that change from the existing door gap or appliance opening to check clearance.

Start with your own measurements or try the worked example.

Floor layers

Use the same existing floor reference at each check point. Enter installed or cured layer thicknesses. Changing units converts the entered measurements.

Layer 1
Door and threshold checks

Fill in the checks you need. Measure the tightest part of the door swing. Enter a positive difference for a higher adjoining floor and a negative one for a lower floor.

Appliance opening

Measure to the lowest fixed edge from the current floor at the front and from the floor inside the bay. Check your appliance’s installation instructions for the required opening height.

ExpertWorx · Floor height

Floor height and clearances

Calculate the floor change to see your height checks.

Will new flooring stop a door opening?

Add the installed thickness of the new layers and subtract the thickness you will remove. Then deduct that net rise from the smallest existing gap under the door through its swing. A zero or negative result indicates a conflict at your measured point. If you have a required operating gap from the door specification, enter it so the checker can flag a result below that target.

Measure from the floor you have now

Draw the floor section and mark the existing finished surface as your reference. Measure each doorway, appliance and transition where you want to check the result. Existing levels may vary across a room. For each calculation, use the build-up and measurements at the specific location rather than assuming the whole room is level. For example, the floor beneath a swinging door may be slightly higher than the floor directly below it when closed.

List only what changes. When an existing finish stays, enter zero for thickness removed. If you take away a tile, an old adhesive bed, or an underlay, measure the net thickness coming out. Write one entry for each new layer that adds height. Some products already include backing or underlay. Check its specification before adding a second layer to the calculation or the installation.

Use installed layer thickness

Use the layer thickness after installation, including a separate cured adhesive bed where it actually adds height. A trowel’s notch is a tool dimension. It cannot tell you the final height of compressed mortar. A profile’s nominal thickness describes the profile itself. Ask the fitter or supplier how the membrane, mortar and tile work together in the chosen installation. Where the result is tight, make and measure a small sample assembly before ordering trims or changing doors.

Check the route an appliance will use to come out

Measure from the existing floor inside the bay to the lowest fixed part of the opening. Measure from the old finished floor at the front to the lowest obstruction the appliance must pass under when it is pulled out. A raised floor at the front can create a step even when the bay stays unchanged. Tick the bay option only if the same net floor change will occur there too. If it has a different build-up, check that location separately and use the actual installed heights.

Look up the installation dimensions for the exact appliance model and enter its required opening height as a planning reference. Keep the real width, depth, levelling adjustment, fixings, pipes and removal sequence on the installer’s checklist. An appliance that sits in the space today still needs a usable path out. Ask the installer to check that path before fitting a raised floor around it.

Worked example with tile over the current floor

Say the proposed layers are 4 mm of levelling compound, 4 mm of cured adhesive and a 10 mm tile. Nothing comes out, so the floor rises by 18 mm. A door with a 14 mm gap now has a calculated gap of −4 mm. The new floor ends up 10 mm above an adjoining floor that was 8 mm above the old finish.

The appliance opening starts at 830 mm in the bay and at the front. If the bay floor stays the same but the finish in front rises 18 mm, the bay remains 830 mm and the front becomes 812 mm. If the selected appliance needs an 820 mm opening, flag the 8 mm shortfall and ask about installation and future removal before ordering.

Use the measurement card before you buy

Save the PDF with the layer schedule and calculated clearances. Give it to the flooring supplier or installer alongside the product instructions and any threshold or appliance drawing. Check the new door clearance against the actual operating requirement. Ask the responsible installer before altering a fire-rated, sealed or specialist door. Check transitions for access, movement gaps and how any exposed edge will be protected.