Refacing makes sense when the cabinet boxes are dry, straight and sound, and the layout already works. Replacement deserves a quote when several boxes are damaged, the layout must move or the hardware cannot be supported reliably. Compare both scopes on the same list of work so the prices mean the same thing.
This guide is written for South Africa. Always check local codes, product specifications, licences, and site conditions.
Step by step
Separate a front change from cabinet replacement
Start by marking which surfaces you actually want to change. A front-only update can leave boxes, shelves and some hardware in place. Refacing can include new fronts plus a new finish to exposed ends and visible frames. A replacement quote may include new cabinet boxes, drawer bases, hardware and fittings, or it may omit the worktop and appliance connections. Ask each supplier to describe the job in written line items rather than relying on the name of the option. This makes it easier to see whether two prices cover the same work. Keep a note of features you definitely want to retain.
Inspect hidden places before measuring new fronts
Empty the sink base and look along the underside of the worktop, the cabinet floor and the edges of the box. Pay attention to swelling, recurring staining, loose backs, failed shelf supports and crumbling board near screws. Check whether adjacent boxes are level enough for consistent door gaps. Look for a slow plumbing leak before blaming a coating or board finish. A fitter can assess whether a single box can be replaced while sound neighbours remain. If there is visible movement in the wall or a damaged countertop spanning several units, get those conditions assessed before you choose a cosmetic scope.
Measure the hinge and clearance constraints
Record the door size, hinge arrangement and which edge opens for each cabinet. A nominally matching replacement door is useful only if the hinge drilling and overlay are appropriate for the box. Photograph examples of corner doors, appliance fronts and handle clearances. Check whether a longer handle might hit a wall, whether a new door thickness changes the fit and whether a drawer can open beside the oven. Bring one removable front, or a measured sketch, when asking a fitter to quote. Do not order from the outside dimensions alone when the hinge and drilling pattern remain unknown.
Price both options with the same inclusions
Give each supplier the same plan and ask them to list doors, ends, panels, handles, hinges, drawer hardware, installation and disposal separately. Add worktops, plumbing, electrical work and any appliance removal if the chosen option affects them. Ask whether VAT is included and whether making good walls or floors is part of the written price. Separate confirmed figures from provisional allowances and possible extras. For example, a refacing quote can look lower until side panels and hinges are added; a replacement quote can include those and still exclude the worktop. Compare the reconciled totals after checking the missing lines.
Plan the handover and set a decision point
Ask for door and drawer samples, expected lead time and an explanation of who will verify final measurements before the order. Agree how the kitchen will be protected during work and which cupboards will be unusable. Confirm that the sample also describes visible edging and the finish on the back of each front. Write down what would change your decision, such as discovering a failing sink unit or having to move plumbing. Leave enough time to compare written revisions. Photograph the completed work and check soft-close action, handle clearances and gaps before accepting the job as complete.
Expert tips
- A paint refresh is a third option for compatible, sound doors. Compare a test piece and realistic labour before assuming it is cheaper for a large kitchen.
- Keep contingency separate from quoted amounts and only enter zero on a comparison sheet when an item is included elsewhere or genuinely unnecessary.
Common questions
Is refacing always cheaper?+
It often retains more of the existing kitchen, but premium fronts, hardware and awkward fitting can narrow the difference. Compare complete written scopes.
Can I retain my existing worktop?+
Possibly, if the boxes and worktop remain stable and the work does not compromise support or services. Have the fitter confirm what removal or changes are needed.
Can I reface only part of a kitchen?+
Yes if matching, alignment and hardware can be managed. Ask to see samples beside the fronts and panels that will remain.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.