On this page
Ask your fabricator for its checklist and have the cabinet run in the final position and condition it requires. Confirm the sink, tap, hob, edges, overhangs and visible joints at the survey. Agree which items must be present. A templated worktop is made to recorded site conditions, so keep the cabinet positions and important details fixed afterwards.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Send the fabricator the appliance and cabinet details
Ask the supplier what it needs at the visit. Bring the installer into the discussion when dimensions or responsibilities cross from the cabinet run to fabricated material.
- Share confirmed models and installation documents for the sink, tap, hob and any feature that changes a cut-out.
- Identify the intended worktop material, finish, edges, worktop runs and any sections supported separately.
- Confirm when the cabinets are ready, whether the old worktop must be removed and how the room will be used between survey and fit.
Step by step
Check that the survey will describe the finished cabinet run
An order quotation may use the planned length of the units. The template survey establishes the precise shape to make for site. Ask the fitter and fabricator what must be fitted, secured and verified first, including end supports, panels and adjacent units. Be clear where wall finishes or backing details will be added after the template. A change to one end of a run can affect seam positions, overhangs and where a sink ends up. Have the suppliers state which tolerances and supporting elements they need, rather than attempting to assess structural support yourself. Where the worktop joins another material, confirm which trade sets its height and who checks the transition.
Confirm the inputs that determine cut-outs and joints
Check the actual model codes rather than just nominal sizes. Two sinks described by the same width can differ in shape and the positions of fittings. Ask which items the fabricator needs on site and who approves the information. Record the type of installation and any ancillary provision for useful clearances. Decide preferences for joint visibility, upstands, returns and finished edges with the fabricator at the visit. Ask which choices are practical for the selected material, support conditions and handling route. Let competent trades determine connections, clearances and any disconnection work. Any changes that are still being priced should be identified before they can affect the template.
Compare an illustrative change after the survey
Imagine that the cabinet run ends at 2,605 mm on the site template. The installer later suggests shifting the end unit 15 mm to improve clearance. The owner also finds a replacement sink advertised in the same size. Either change could move where the fabrication needs to start or place a cut-out. Tell the fabricator before altering the cabinet or ordering the new sink. Ask whether a second template is needed and who pays for any agreed change. Check whether the product has already entered manufacture. The safe decision is to coordinate the change on a drawing and with the written supplier process, rather than hoping that the unused material or a trim can take up the difference.
Prepare for the fit and the period without a finished surface
Ask how long the room will be without normal worktop use and agree access before booking any other dependent trade. Confirm the route into the property and which items you need to clear away, including any access through common parts. Ask who will disconnect and reconnect equipment where needed, who arranges tests and when the room can resume use. Store a record of the survey, the final product choices and the dates the cabinets and template were accepted. Ask the installer to explain maintenance, any use limits and where to report a question. Check the fitted item against the recorded choices rather than a photograph of an ideal room.
Expert tips
- Have one named person agree choices at the template visit. Send the same written record to the fitter, fabricator and person responsible for later connections.
- Do not attempt to cut, drill or reshape fabricated material at home. Tell the fabricator about the issue and ask for a suitable correction route.
- Record whether the supplier needs existing surfaces clear for measuring and whether you are expected to remove temporary ones before fitting. Schedule any affected work with the cabinet installer.
Common questions
Can I use a basic kitchen drawing as the final template?+
Ask the supplier what it fabricates from. For a bespoke templated product, the accepted site record or other specified measurement process normally has the information needed for fabrication.
Can I move a unit after the template visit?+
Ask the fabricator before altering it. A moved unit, changed wall finish or substituted fitting can affect the measured design, and the fabricator can explain what must be checked again.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- HowdensHow to plan for a template and fit worktopOne UK supplier’s preparation and survey requirements for bespoke fabrication.↗
- HowdensBespoke worktop installationSupplier detail about templating and fitting responsibilities.↗
- Wren KitchensSpecialist worktop brochureA second UK manufacturer’s requirements for templated worktops.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.