THE SHORT ANSWER

Ask the fitter for the roof’s true slope lengths and finished strip lengths, including the chosen system’s laps and edge details. Draw each continuous strip and place those pieces against the exact roll width and length. Count rolls by the cuts they can supply. Roof area divided by roll area can miss overlap and unusable offcuts.

Regional note

This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.

Preparation

Use ground-level information and a fitter’s cutting schedule

Work from verified drawings or a competent fitter’s measurements. Shed roofs may be fragile. Stay on the ground throughout this planning check.

  • Get the felt manufacturer’s current sheet and exact roll dimensions.
  • Identify the roof shape, number of slopes and the proposed product system.
  • Ask the fitter to list laps, ridges, verge allowances and any separate trim that changes the order.
The method

Step by step

01

Confirm that the felt is suitable for the shed

Use the complete product name and intended construction. A decorative top sheet, an underlay and a complete shed covering can have different functions. Check the manufacturer’s limitations on roof pitch, expected use and suitable deck. Ask the fitter to assess any failed deck, fixings or moisture damage before the material order. Make a written distinction between replacing the visible weather layer and replacing other layers that the inspection identifies. If the proposed roof is unusually shallow, partially covered or previously altered, ask for the recommendation in the system supplier’s own terms so you can price the correct covering.

02

Draw the finished roof faces on a worksheet

Use the true surface length down each slope from the fitter’s dimensions. Record ridge or high edge, eaves and both ends of the shed. Plan-view length and width are useful cross-checks, but slope measurements can differ from dimensions on level ground. Note whether both roof faces are the same, and record an out-of-square corner if it changes which cut is longest. Draw any area that needs a separate detail. A broken edge or soft board needs repair advice, so mark the affected section without making the assumption that a new covering will compensate. Ask for the last measurement pass before ordering.

03

Record the finished strips with laps already included

Ask for each piece’s required cut length and width after the fitter incorporates the chosen lap, edge and ridge details. Label each as a continuous strip where the specification requires that. Check whether a narrower strip can be taken from the same width of roll as another piece. Keep the product-data measurements in your worksheet, including whether the nominal width or usable cover width is relevant to each entry. Do not treat a generic overlap or the full raw roll area as a measured cover allowance. The cut layout is what translates the roof into the store purchase.

04

Pack the cuts against whole rolls in a worked example

Suppose the fitter confirms the job requires three uninterrupted full-width strips, each 3.70 m long. These are finished cut lengths that already include the relevant end allowances. Total strip length is 11.10 m. Each 8 m example roll takes two strips, using 7.40 m and leaving 0.60 m. The third strip needs a second roll, regardless of whether unused width or isolated area appears available on the roof-side sketch. On a four-strip job, the same two rolls would each supply two. If a fitter proposes using leftover pieces in another detail, check that it can be cut in the right orientation and installed within the specifications.

05

Order the approved system and check the delivered labels

Give the supplier the product code, roll dimensions and strip list. Ask the fitter or supplier to check that the order includes any distinct parts or materials called for by the actual roof build-up. Compare alternative sizes using the same cut list and confirm any trade-off in pack handling and leftover length. On delivery, verify all labels and check rolls for damage in accordance with the supplier’s instructions. Keep product data and the drawing for the job record. Any change to strip direction, product or installation detail needs a fresh cut comparison before you rely on the quantity.

Before you start

Expert tips

  • Include laps once if the fitter’s cut list already incorporates them.
  • Compare continuous strip lengths before using the area as a cross-check.
  • Keep the roof’s slope and the product’s stated suitability in the same planning note.
People also ask

Common questions

How many rolls do I need for a 3 m by 2 m shed?+

The plan footprint alone cannot tell you. Use confirmed slope dimensions and the actual cut list, then compare it with the selected roll width and length.

Can a leftover strip complete a longer piece?+

Follow the system specification and fitter’s advice on permissible joins. Count a continuous piece wherever the design requires it.

Should I buy an extra roll for waste?+

Record a justified allowance for any real uncertainty, damage or tricky cuts. Where dimensions and cuts are uncertain, ask the fitter to confirm before buying.

Primary references

Sources & further reading

We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.

  1. IKO UKIKO Super Shed Felt technical dataManufacturer’s product uses, raw dimensions and installation limitations.
  2. IKO technical sheet hosted by WickesIKO Shed Felt application and installation instructionsPrimary installation sheet documents product-specific overlap and detail requirements.
!
Know your limit

Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.