THE SHORT ANSWER

Multiply the slab length and width in feet by its thickness in inches divided by 12. This gives cubic feet, which you divide by 27 for cubic yards. For bags, divide cubic feet by the product's mixed yield per bag and round up. Add separate thickened sections before converting.

Regional note

This guide is written for United States. Always check local codes, product specifications, licences, and site conditions. Browse the United States edition.

Preparation

Get confirmed dimensions before ordering

This worksheet converts a design section to volume. Use the crew's or designer's specified slab dimensions and mix.

  • Get the inside form dimensions and the specified thickness from the plan.
  • Identify any separately dimensioned thicker edges, pads and sections.
  • Get the supplier's current delivery increments or the bagged product's yield, plus availability and handling details.
The method

Step by step

01

Check that the drawing dimensions describe the pour

Use the planned inside dimensions of the forms. Check whether measurements taken on the ground represent the slab itself or a larger excavation with base material. Ask who verifies the finished levels, form dimensions and base before concrete is ordered. If the design includes a slope, a step or a thickened section, ask for the volumes or dimensions needed for that detail. Keep the volume calculation separate from choosing thickness, reinforcement, mix type and joint design. Those requirements depend on the location, use and conditions and need to be resolved before the material order is placed.

02

Convert all dimensions before multiplying

Use feet for length and width to get square feet. For thickness measured in inches, divide by 12 to convert to feet. Multiply the area by that thickness to get cubic feet of material. With an irregular footprint, divide it into separate areas and avoid overlaps. If the main slab area already includes a thickened edge, account only for the extra depth of that edge so you do not count its ordinary thickness twice. Retain the individual dimensions and columns for area, thickness and volume. That makes it easier for another person to check the figures before delivery.

03

Use the mix yield to compare material forms

Suppose a plan calls for a simple 10-foot by 6-foot section at 4 inches thick. Its area is 60 square feet and the thickness is one third of a foot, so the calculated volume is 20 cubic feet. Divide by 27 to get about 0.74 cubic yard before adjustments. A specific bag product with a published yield of 0.60 cubic foot would give 20 ÷ 0.60, or 33.33 bags, which rounds to 34 bags before adjustments. A different bag weight or product might give a different yield. The example shows the conversion and does not set a slab specification.

04

Confirm the allowance and what the supplier will deliver

The design volume assumes the forms and base match the plan, so ask the crew how much additional volume it expects for measurement differences or loss during placement. Add that amount before the final order calculation. Compare ready-mix availability and delivery charges with the practical equipment and labor needed to mix bags. Ask about truck access, delivery minimums, short-load charges, unloading windows and placement method. If ordering bags, check the handling load as well as the number of bags. Do not use dry powder weight as a replacement for the volume the manufacturer says the mixed product yields.

05

Keep the supplier order and the site plan in sync

Send the final measured plan and record the mix, volume, order increment and accepted delivery time. If the prepared base or dimensions change, update the estimate and check the mix and order with the supplier before work. Ask how shortages or excess are handled while placement is in progress and how concrete waste or wash water will be contained appropriately. Keep base aggregate, reinforcement, forms, curing materials and ready-mix on distinct worksheet lines. A slab volume entry answers one purchasing question and leaves the rest of the job visible to the crew and supplier.

Before you start

Expert tips

  • Store fractions and unrounded numbers until the final order step. Avoid using 0.3 foot for 4 inches, which is 0.333… foot.
  • Annotate the quote with the actual yield or ready-mix order increment so two suppliers can be compared on the same basis.
People also ask

Common questions

How many cubic feet are in a cubic yard?+

A cubic yard is 3 feet by 3 feet by 3 feet, so it contains 27 cubic feet.

Does every 80-pound bag yield the same volume?+

Use the data sheet for the exact bagged mix. The dry weight alone does not establish the mixed yield.

Where do I put extra thickness in my calculation?+

Calculate the extra section separately using the added depth, or schedule that area at its full depth without counting it in the main slab again.

Primary references

Sources & further reading

We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.

  1. QUIKRETEMixing, placing and estimating concrete mixesSlab volume, bag-yield example and practical material planning.
  2. Missouri Center for Career EducationOrdering, pouring and finishing concreteCubic-foot to cubic-yard conversion and ready-mix order quantities.
!
Know your limit

Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.