Ask each contractor to price the same drawing, demolition scope, cabinet schedule and finish list. Add the cost of omitted work and reconcile allowance differences before comparing totals. Record who handles permits, inspections and debris, then ask for the revised scope and change-order terms in writing before committing.
This guide is written for United States. Always check local codes, product specifications, licences, and site conditions. Browse the United States edition.
Gather the paperwork
The useful comparison starts with written bids for one agreed design.
- Mark the drawing revision and every appliance, cabinet run and finish that is included.
- Gather allowance amounts, exclusions, payment milestones and estimated order lead times.
- Ask the city or county about the permit process for the actual scope if responsibilities remain unclear.
Step by step
Set the same starting scope
Write down which cabinets, appliances, walls, floors, and service locations will stay. A cosmetic refresh with existing connections is a different job from a layout change with new service routes. If you want bidders to price both, request a common base scope and a separate price for the optional work. Record the same planned appliance models, finish heights and fixture locations wherever you have them. When a product decision is open, describe the minimum specification and ask for a named allowance. Give each bidder the same dated information and ask them to flag inconsistencies before pricing.
Give every cost one place in the worksheet
Create a line for demolition and disposal, site protection, cabinets and hardware, countertop and templating, appliance installation, plumbing, electrical, finishes, and final cleaning. Add permit and inspection responsibilities where applicable. Ask the bidder to identify what is included within the fixed price, what is an allowance, and what you will purchase directly. The right column is for the cost to complete the same project. Mark missing numbers as open and get them confirmed. Include relevant taxes, delivery, and charges for non-standard access. If the firm cannot price a concealed condition, record how it will be assessed.
Read allowances as estimates for named work
An allowance is useful when it names the item, quantity, and included work. A cabinet hardware allowance of $400 tells you more if it covers 25 handles and excludes installation, which is priced elsewhere. Ask whether excess allowance amounts carry markup and what happens to an underspend. Check if sale items, substitutions, and upgrades change the labor price. For appliances you buy directly, record the delivery window, installation responsibility, and who checks the sizes before ordering. A low allowance can make an expensive specification appear cheaper until the selections are made.
Work through two illustrative bids
Bid A totals $24,000 with a $1,200 countertop allowance. Bid B totals $26,000 with a $2,700 allowance for the same countertop specification. Suppose your chosen surface, including measurement and installation, is written up at $2,700 and both bids otherwise cover the same work. Bid A is $25,500 on that basis. If A also excludes a $700 debris service that B includes, its comparable total rises to $26,200. Those are invented arithmetic inputs for one example. Ask the contractors to confirm real omissions, scope, and markup before treating the revised totals as contract prices.
Document responsibilities before accepting the quote
Ask who orders long-lead items, who checks that doors and drawers clear adjacent appliances, and who protects the rest of the home while work is underway. Obtain current licensing and insurance information where applicable and verify it through the appropriate local office. Inspections and permit rules vary by address and work type. Write down who applies and who schedules inspections before concealed work is covered. For unexpected work, record what evidence is needed, how a price is calculated, who can approve a change, and how the schedule will be updated. Save the dated documents with your payment records and finish selections.
Expert tips
- Use a column for the person responsible and a column for the date needed. A cabinet that arrives late can move countertop templating even if the rest of the project is on schedule.
- Treat contingency as a budget reserve. Record what it is available to cover and keep it visible until the work actually requires a signed change.
Common questions
Does the lowest kitchen estimate always cost less at completion?+
Compare documented inclusions and comparable selections first. One firm may cover specialist fitting, tax or disposal that another leaves to the owner. Where an amount is unknown, mark it open and ask for written clarification rather than assigning zero.
Where do I check contractor and permit information?+
Ask the licensing or registration authority that applies in your state or locality about the contractor. Contact the building office responsible for the property address with the exact project description and any work proposed on services or structure.
Should I use national cost ranges to select a bidder?+
Use current comparable local written bids for the decision. A national range can provide context, but it may represent a different size, material level, region, and set of included services.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.