On this page
Ask the fitter to separate assessment, preparation, any specified underlayer or waterproofing and the final tile work. Identify the floor construction, condition and expected finished height. Two quotes that cover the same area can assume different work below the tile. Ask for the proposed system and its evidence before comparing the totals.
This guide is written for United Kingdom. Always check local codes, product specifications, licences, and site conditions. Browse the United Kingdom edition.
Record the existing floor and the fittings staying in place
Collect drawings or installation records you already have. Keep unconfirmed floor layers and older materials marked for competent assessment.
- Measure the tiling area and thresholds. Mark the bath, tray, toilet and fixed furniture that affect the edge details.
- Record visible damage, unevenness, loose finishes or history of wetting without opening the floor.
- Provide the exact tile type, dimensions and layout. Ask each installer to describe which products and assessment their quote assumes.
Step by step
Check what the preparation line includes
Ask the bidder to identify what they expect to see before laying tiles and which inspection is included. Timber, concrete, screed and older coverings may require different assessments and manufacturer-approved systems. Ask who checks the surface condition, movement and whether it is appropriate for the tile and proposed use. Discuss what will happen if appropriate assessment finds the expected layers are different. Keep suspect materials undisturbed and get competent advice. A quote can include disposal of the visible finish while leaving out changes to the substrate. Ask if anything beyond surface preparation will be needed, including work by another trade or a follow-up visit before installation begins.
Compare the named system with the intended use
Ask which products and details the installer proposes for this floor and what each part does. A wet-room floor should be considered with the drainage and waterproofing design for the assembly. A bathroom outside the shower may have different requirements for exposure, floor support and detailing. Ask the installer to show where their responsibility ends and who checks any related work. Use the manufacturer’s guidance for substrate and setting material compatibility. Determine what dimensions each new layer adds at the door and surrounding fittings. A cheaper price can involve different preparation and setting products or omit an installation step another formula includes. Treat the different scopes as alternatives until the fitter explains them.
Calculate the illustrative scope difference
Suppose a quote is £530 for laying tiles on a floor the contractor assumes is already suitable. A second is £800 after including an agreed £180 preparation line and £90 for transition work, all on the same VAT basis for this example. The first headline would match only if the missing preparation and transition were either unnecessary or provided for the same combined amount. Ask both bidders what their proposal includes to protect the chosen tile, how product changes are agreed and which additional costs are still provisional. Check the tile supply, removals, edging and applying the selected layout. A square-metre price compares only one slice of the scope, especially when rooms are small and many edges need attention.
Agree when the chosen floor can be checked and used
Get the accepted specification and stages in writing. Ask who verifies the subfloor after removal where appropriate and what work must wait until that review occurs. Record the proposed finished levels using a drawing or suitable sample so the works can be compared. Keep agreed instructions for access, any required curing time, cleaning and treatment of exposed transitions. Ask how the team will confirm the correct products were installed. At handover check the agreed appearance, access and workmanship with the responsible contractor. Store product labels, spare tiles and preparation records, so a future change or repair can be traced to the system actually installed beneath the finish.
Expert tips
- Ask the fitter to flag which dimensions depend on the full build-up. A door may swing through a different finished clearance after preparation and tiling.
- Compare where the tile layout starts and how its visible cuts finish. That can matter to offcuts even when both bids cover the same area.
- Ask for a photograph of the product labels and one image of each agreed preparation stage, taken by the responsible trade. Keep the record with the final specification so you know which parts of the floor were assessed and which still need investigation if the work extends later.
Common questions
Should I compare price per square metre between quotes?+
Use the rate to understand labour, but check what each includes for the actual floor, finish and room interfaces. Compare the payable total for equivalent work.
Will the fitter know the final preparation before seeing the existing floor?+
Ask which conditions are already verified and which are provisional. Agree what triggers further assessment, how it is priced and who authorises a change.
Sources & further reading
We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.
- Topps TilesSubstrate preparationUK tiling supplier’s guidance on assessing suitability before finishing.↗
- BALYour Plus sitework guideTechnical and product guidance on tiling to different substrates in specific situations.↗
- Citizens AdviceBefore you get work done on your homeEngland consumer guidance on written quotes, contracts and paying for home improvements.↗
Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.