THE SHORT ANSWER

Two 115 mm plywood uprights on a 300 × 170 mm base hold a removable 280 mm dowel. The example takes rolls up to about 145 mm across if their cores fit the rod. Lift the rod out to change rolls and use ordinary scissors separately on the bench when cutting tape.

Preparation

Cut list and materials

Measure rolls across the outer diameter and their smallest core opening before buying parts. Keep a sample of the thickest roll close during dry assembly.

  • One 300 × 170 mm base and two 100 × 115 mm uprights cut from 18 mm plywood.
  • One 280 mm length of 20 mm smooth dowel; two 65 × 35 mm corner supports cut from sound timber scrap.
  • Adhesive suited to the timber, fixing screws sized to stay inside the material, pads and a sanding block.
The method

Step by step

01

Calculate rod clearance and width

Lay the widest roll on the worktop and measure its outside diameter. This design sets the rod centre approximately 90 mm above the top of the base. A 145 mm roll has a radius of 72.5 mm, leaving about 17.5 mm above the base when the roll is centred. If you store a roll with a larger diameter, draw it on card against the side profile so that you see any collision before increasing the height. Measure the combined widths of all intended rolls and leave space to find and grip each tape end. Rolls with a core smaller than 20 mm need a thinner rod selected for the weight of the stack, or a separate holder.

02

Mark and cut the two open cradles

Mark a centreline on each upright across its 100 mm width. Sketch a 22 mm-wide open seat from the top of the panel, with a smooth curved bottom to support the rod. Set the bottom of the seat about 80 mm above the base so the rod centre is close to 90 mm once it settles. Try the shape in a single scrap first. The rod should lift out without binding yet stay supported during light handling. Clamp pieces securely while cutting and use a tool suited to the stock. Ask a wood supplier or workshop to make the seats if you cannot safely support the pieces. Ease the edges to prevent the dowel catching.

03

Space the uprights and support their feet

Dry-fit the two uprights at about 30 mm and 270 mm from the left end, measuring to their centre lines. The 280 mm rod then has room to project beyond the uprights on each side. Test both end clearances against the actual rod before fixing. The supports sit on the base and brace each upright against sideways movement. Put them where they cannot get in the way of the widest tape roll. On a known flat bench, square the uprights to the base and check that the dowel enters both seats together. Fix the feet and supports with suitable glue and fixings, avoiding protruding points. Keep the assembly unloaded while it cures.

04

Put the stand through a low-load test

Sit the rack on its final work surface with the rolls centred between the supports. Lift the rod with both hands and check the stack cannot slide onto your fingers as it comes free. Pull a short length of tape with the stand supported by your other hand. If the base slides on the bench, add non-marking feet or gather tape off the rod before pulling harder. A stand that needs force is liable to lift or tip, especially with sticky packing tape. Fold over a small tab on each frequently used roll, so the tape end is easy to find without scraping the edge. Store the dowel in the seats after changing rolls.

Before you start

Expert tips

  • Keep heavy rolls near the base centre and space the lighter ones beside them.
  • Leave enough hand clearance above the dowel if the bench sits under shelving. Park a loose spare roll next to the organiser if it would otherwise make the rod awkward to lift with both hands.
People also ask

Common questions

Can I attach a blade to the front?+

Use a separate, suitable cutter or scissors on the worktop. This layout leaves the front of the stand open for changing rolls and handling the lifted dowel, so an exposed cutting edge would sit where fingers regularly pass.

What if the dowel slides sideways?+

Check the overhang at both ends and add loose, removable stops that cannot interfere with the cradles. Always hold the rod horizontally when changing rolls. If the seats are out of line, square the supports before replacing the dowel.

Primary references

Sources & further reading

We link to official building-code, government and public-health material where a technical or safety claim needs authoritative context. Local rules and adopted code editions can change.

  1. UK Health and Safety ExecutiveCutting and sanding woodReference for controlling dust when cutting and sanding. The measured design is ExpertWorx’s own example.
!
Know your limit

Stop if the work involves structural uncertainty, hazardous materials, heights, live services, gas, serious water damage, or regulated work. Local rules differ—use an appropriately licensed professional where required.